HDPE Installation

2016

#262
Wayzata Area Interceptor
Wayzata, Minnesota

Brown and Caldwell
Peter Glashagel
30 7th St, E.
Suite 2500
St. Paul, MN 55101

S M Hentges& Sons
Iain Cochran
650 Quaker Ave.
Jordan, MN 55352
952 492-5700

2,525’ 24” HDPE IPS Force Main 3 shots
April 2016
$231,350.00

#263
Abbey Springs Water System
Village of Fontana, Wisconsin

Ruekert-Mielke
Joeseph Eberle
W233 N2080 Ridgeview
Waukesha, WI 53188
262 542-5733

Wanasek Contractors
Mike Heitman
29606 Durand Ave
Burlington, WI 53105
262 767-9917

5100’ 14” HDPE DIPS Water Main
395’ 8” HDPE DIPS Water Main
March-April, 2016
$300,000.00

#264
Lewis & Clark Regional Water System
Magnolia Service Line Segment
Magnolia, Minnesota

Banner Engineers
Dennis Odens
409 22nd Ave. S.
Brookings, SD 57006
605 692-6342

Carstensen Contracting
Brad Carstensen
1507 7th St. SE
Pipestone, MN 56164
507 825-2026

173’ 36” Steel Casings
550’ 24” HDPE IPS Casings
120’ 24” Steel Casings

#270
2016 Water Main Construction
McKinley, Minnesota

Benchmark Engineering
Alan Johnson
8878 Main St.
Mt. Iron, MN 55768
218 735-8914

USA
Jim Pucel
PO Box 706
Eveleth, MN 55734
218 744-4342

5,000’ 8” HDPE DIPS Water Main
310’ 12” HDPE DIPS Casing
345’ 12” Steel Casing
September 2016
$150,000.00

#273
Water System Improvements
New Odanah, Wisconsin

Indian Health Services
9A S. Brown St.
Rhinelander, WI 54501
715 365-5145

Howard Bros.
Keith Howard
PO Box 290
Arbor Vitae, WI 54568
715 356-3670

12,300’ 10” HDPE DIPS Water Main
2,100’ 8” HDPE DIPS Water Main
October 2016
$330,000.00

#276
ILAW North Side Interceptor Phase 3
Urbana, Illinois

Fehr Graham
Matt Johnson
340 N. Neil St.
Champaign, IL 61701
217 352-7688

Stark Excavating
Brad Jameson
1805 W. Washington St.
Bloomington, IL 617001
309 275-2455

1,570’ 24” DI Water Main
400’ 30” HDPE Water Main
December 2016, April 2017
$264,000.00

2017

#280
Lift Station 3 Force Main Replacement
Clear Lake, Iowa

Laurie Twitchell
Fox Engineering
414 S. 17th St. Ste. 107
Ames, IA 50010
515 233-0080

Clear Lake Sanitary District
Kevin Moler
5631 235th St.
Clear Lake, IA 50428
641 529-0862

1,700’ 16” HDPE IPS Force Main
April 2017
$80,000.00

2019

#299
WAWSA 2018 Transmission Main
Watford City, North Dakota

Allen Schultz
AE2S
1102 Main St.
Williston, ND 58801
701 774-3080

BEK
Lonnie Kern
PO Box 1010
Dickinson, ND 58601

630’ 26” Steel Casing
1,030’ 20” CLPVC Water Main
150’ 16” HDPE IPS Casing
14,500’ 10” IPS Water Main
April-May, 2019
$480,000.00

#302
Silver Lake Force Main
Salem Lakes, Wisconsin

Travis Anderson
Strand Associates
910 West Wingra Dr.
Madison, WI 53715
608 251-4843

Fischer Excavating
Joe Fischer
1567 N. Heine Rd.
Freeport, IL 61032
815 233-3232

1,815’ 14” HDPE DIPS Force Main w/one shot 1,375’
May, August 2019
$140,000

#306
Water Transmission Line 19-01
Lincoln, North Dakota

Kenneth Nysether
SEH
4719 Shelburne St.
Bismarck, ND 58503

Wagner Construction
Mike Brewinski
3151 Hwy 53
International Falls, MN 56649
218 283-3700

310’ 10” HDPE DIPS Water Main
1,668’ 14” HDPE DIPS Water Main
725’ 18” HDPE DIPS Water Main
$120,000
July, August 2019

#311
Lift Station 10 Improvements
Andover, Minnesota

Kevin Kielb
Bolton &Menk
7533 Sunwood Dr.
Ste. 206
Ramsey, MN 55303

Minger Construction
Aaron Hoefs
620 Corporate Dr.
Jordan, MN 55352
952 368-9200

3118’ 12” HDPE DIPS Force Main 3 shots, 330’ 10” IPS Water Main
July, November 2019
$120,000.00

#316
Glacial Lakes Sanitary Sewer Force Main
New London, Minnesota

Bill Lueck
SEH
3535 Vadnais Center Dr.
St.  Paul, MN 55110
800 325-2055

Crow River Construction
Kraig Hanson
PO Box 432
New London, MN 56273
320 354-5554

 12,100’ 10” HDPE DIPS Force Main
2,500’ 12” HDPE DIPS Force Main
Sep.-Oct. 2019
$406,000

2020

#320
12” HDPE Gas Main Relocation
Austin, Minnesota

Austin Utilities
Todd Jorgenson
1908 14th St. NE
Austin, MN 55912
507 433-8886

5,370’ 12” HDPE Gas Main
$150,000
April 2020

#322
2020 South Interceptor
Baxter, Minnesota

Bryan Drown
Bolton &Menk
7656 Design Rd.
Baxter, MN 56425
218 825-0684

RL Larson
Doug Moen
2255 12th St. SE
St. Cloud, MN 56304
320 654-0709

2,200’ 8” FPVCForce Main    May, July-August, 2020
1,634’ 12” FPVCWater Main        $348,000
900’ 16” FPVCWater Main
120’ 18” HDPECasing
300’ 24” HDPECasing
400’ 24” FPVCStorm Sewer

#323
S. Union Pump Station and Force Main
Mauston, Wisconsin

Scott Chilson
MSA
1230 South Blvd.
Baraboo, WI 53913
608 356-2771

Gerke Excavating
Kurt Thorton
15341 State Hwy. 131
Tomah, WI 54660
608 372-4203

5400’ 12” HDPE Force Main
$173,000
June 2020

#325
2020 Pearl Street Utility Improvements
Prescott, Wisconsin

Greg Adams
Cedar Corporation
604 Wilson Ave.
Menomonie, WI 54751
715 235-9081

Total Excavating
Justin Sullivan
141 Hwy 35N
River Falls, WI 54022
715 426-1777

430’ 10” HDPE DIPS Water Main in Rock
$76,000.00
June 2020

#327
Stonegate Addition Water Main
Lake Elmo, Minnesota

Mike Warner
Bolton &Menk
2035 CR D East
Maplewood, MN 55109
651 704-9970

A-1 Excavating
Lynn Bender
PO Box 90
Bloomer, WI 54724
715 568-4141

6,650’ 14” HDPE DIPS Water Main
6,225’ 10” HDPE DIPS Water Main
1,150’ 1.5” Copper water Service
$420,000
June-July 2020

#329
North Dakota State Hospital Water Main
Jamestown, North Dakota

Darrell Hourbuckle
Interstate Engineering
PO Box 2035
Jamestown, ND 58402
701 252-0234

Scherbenske, Inc.
Colleen Lund
2511 17th St. SE
Jamestown, ND 58401
701 252-2652

5,150’ 12” HDPE DIPS Water Main
$185,000
September 2020

#330
SWLRT Light Rail Project
Minneapolis, Minnesota

Earth Evans
WSB
701 Xenia Ave. S
Minneapolis, MN 55416
763.541.4800

Pete’s Water & Sewer
Tony Diehl
23165 Jefferson St. NE
Minneapolis, MN 55418
612 789-6162

240’ 24” HDPEStorm Sewer
$94,000
May 2020

#333
Well No. 5 Connecting Water Main
Lake Elmo, Minnesota

Mike Warner
Bolton &Menk
2035 CR D East
Maplewood, MN 55109
651 704-9970

Miller Excavating
Steve St. Claire
3741 Stagecoach Trail N
Stillwater, MN 55082
651 439-1637

2,360’ 14” HDPE DIPS Water Main
200’ 1” Copper Water Service
$110,000
August 2020

#334
Variolite Street Reconstruction
Ramsey, Minnesota

City of Ramsey
Engineering Dept.
7550 Sunwood Dr. NW
Ramsey, MN 55303
763 427-1410

Park Construction
Mike Christianson
1481 81st Ave. NE
Minneapolis, MN 55432
763 786-9800

4,500’ 12” HDPE DIPS Water Main
$148,000
August 2020

#335
AMPI Expansion Force Main Upsize
Paynesville, Minnesota

Chuck DeWolfe
Bolton &Menk
2040 Hwy. 12 E.
Wilmar, MN 56201
320 231-3956

Eagle Construction
Jayd Newman
515 9th Ave NW
Little Falls, MN 56345
320 632-5429

5,700’ 14” HDPE DIPS Force Main
$198,000
September 2020

#336
East Side Interceptor
Medford, Wisconsin

Mike Stoffel
Ayres Associates
3433 Oakwood Hills Pkwy
Eau Claire, WI 54701
715 834-3161

Switlick & Sons
Merlin Switlick
1208 Mount View Lane
Athens, WI 54411
715 257-9081

1,130’ 12” HDPE DIPS Water Main
1,450’ 10” HDPE DIPS Sanitary Sewer
215’ 8” HDPE DIPS Sanitary Sewer
$169,000
October 2020

#338
Kindeva Drug Delivery Site Development
Woodbury, Minnesota

Mike Nill
Bolton &Menk
2035 CR D East
Maplewood, MN 55109
651 704-9970

Rachel Contracting
Jud Getty
4125 Napier Court NE
St. Michael, MN 55376
763 274-9462

1,000’ 18” HDPEDIPS Water Main – 1 shot
120’ 14” HDPEDIPS Water Main
$67,000
November 2020