HDPE Installation

2016

#262
Wayzata Area Interceptor
Wayzata, Minnesota

Brown and Caldwell
Peter Glashagel
30 7th St, E.
Suite 2500
St. Paul, MN 55101

S M Hentges& Sons
Iain Cochran
650 Quaker Ave.
Jordan, MN 55352
952 492-5700

2,525’ 24” HDPE IPS Force Main 3 shots
April 2016
$231,350.00

#263
Abbey Springs Water System
Village of Fontana, Wisconsin

Ruekert-Mielke
Joeseph Eberle
W233 N2080 Ridgeview
Waukesha, WI 53188
262 542-5733

Wanasek Contractors
Mike Heitman
29606 Durand Ave
Burlington, WI 53105
262 767-9917

5100’ 14” HDPE DIPS Water Main
395’ 8” HDPE DIPS Water Main
March-April, 2016
$300,000.00

#264
Lewis & Clark Regional Water System
Magnolia Service Line Segment
Magnolia, Minnesota

Banner Engineers
Dennis Odens
409 22nd Ave. S.
Brookings, SD 57006
605 692-6342

Carstensen Contracting
Brad Carstensen
1507 7th St. SE
Pipestone, MN 56164
507 825-2026

173’ 36” Steel Casings
550’ 24” HDPE IPS Casings
120’ 24” Steel Casings

#270
2016 Water Main Construction
McKinley, Minnesota

Benchmark Engineering
Alan Johnson
8878 Main St.
Mt. Iron, MN 55768
218 735-8914

USA
Jim Pucel
PO Box 706
Eveleth, MN 55734
218 744-4342

5,000’ 8” HDPE DIPS Water Main
310’ 12” HDPE DIPS Casing
345’ 12” Steel Casing
September 2016
$150,000.00

#273
Water System Improvements
New Odanah, Wisconsin

Indian Health Services
9A S. Brown St.
Rhinelander, WI 54501
715 365-5145

Howard Bros.
Keith Howard
PO Box 290
Arbor Vitae, WI 54568
715 356-3670

12,300’ 10” HDPE DIPS Water Main
2,100’ 8” HDPE DIPS Water Main
October 2016
$330,000.00

#276
ILAW North Side Interceptor Phase 3
Urbana, Illinois

Fehr Graham
Matt Johnson
340 N. Neil St.
Champaign, IL 61701
217 352-7688

Stark Excavating
Brad Jameson
1805 W. Washington St.
Bloomington, IL 617001
309 275-2455

1,570’ 24” DI Water Main
400’ 30” HDPE Water Main
December 2016, April 2017
$264,000.00

2017

#280
Lift Station 3 Force Main Replacement
Clear Lake, Iowa

Laurie Twitchell
Fox Engineering
414 S. 17th St. Ste. 107
Ames, IA 50010
515 233-0080

Clear Lake Sanitary District
Kevin Moler
5631 235th St.
Clear Lake, IA 50428
641 529-0862

1,700’ 16” HDPE IPS Force Main
April 2017
$80,000.00

2019

#299
WAWSA 2018 Transmission Main
Watford City, North Dakota

Allen Schultz
AE2S
1102 Main St.
Williston, ND 58801
701 774-3080

BEK
Lonnie Kern
PO Box 1010
Dickinson, ND 58601

630’ 26” Steel Casing
1,030’ 20” CLPVC Water Main
150’ 16” HDPE IPS Casing
14,500’ 10” IPS Water Main
April-May, 2019
$480,000.00

#302
Silver Lake Force Main
Salem Lakes, Wisconsin

Travis Anderson
Strand Associates
910 West Wingra Dr.
Madison, WI 53715
608 251-4843

Fischer Excavating
Joe Fischer
1567 N. Heine Rd.
Freeport, IL 61032
815 233-3232

1,815’ 14” HDPE DIPS Force Main w/one shot 1,375’
May, August 2019
$140,000

#306
Water Transmission Line 19-01
Lincoln, North Dakota

Kenneth Nysether
SEH
4719 Shelburne St.
Bismarck, ND 58503

Wagner Construction
Mike Brewinski
3151 Hwy 53
International Falls, MN 56649
218 283-3700

310’ 10” HDPE DIPS Water Main
1,668’ 14” HDPE DIPS Water Main
725’ 18” HDPE DIPS Water Main
$120,000
July, August 2019

#311
Lift Station 10 Improvements
Andover, Minnesota

Kevin Kielb
Bolton &Menk
7533 Sunwood Dr.
Ste. 206
Ramsey, MN 55303

Minger Construction
Aaron Hoefs
620 Corporate Dr.
Jordan, MN 55352
952 368-9200

3118’ 12” HDPE DIPS Force Main 3 shots, 330’ 10” IPS Water Main
July, November 2019
$120,000.00

#316
Glacial Lakes Sanitary Sewer Force Main
New London, Minnesota

Bill Lueck
SEH
3535 Vadnais Center Dr.
St.  Paul, MN 55110
800 325-2055

Crow River Construction
Kraig Hanson
PO Box 432
New London, MN 56273
320 354-5554

 12,100’ 10” HDPE DIPS Force Main
2,500’ 12” HDPE DIPS Force Main
Sep.-Oct. 2019
$406,000

#314
12” HDPE Gas Main Relocation
Austin, Minnesota

 

Austin Utilities
Todd Jorgenson
1908 14th St. NE
Austin, MN 55912
507 433-8886

5,370’ 12” HDPE Gas Main
$150,000
April 2020